Continuous Measurement Campaigns are underway at L. Tahoe and 3 sites in Australia. Periodic campaigns, including supplemental measurements at the continuous measurement sites are planned for the following dates:

WRS2 Path/Row Overpass Date (ETM+ based) Location Lat Lon MASTER Overpass Purpose
43,33 March 12 L. Tahoe, CA, USA 39° N 120° W B200 TIR validation
40, 33 March 23 Railroad Valley, NV, USA 38.53° N 115.69° W No VSWIR validation
39,35 April 1 Ivanpah Playa, CA, USA 35.54° N 115.38° W No VSWIR validation
40, 33 April 8 Railroad Valley, NV, USA 38.53° N 115.69° W No VSWIR & TIR
validation
43,33 April 13 L. Tahoe, CA, USA 39° N 120° W DC8 VSWIR & TIR
validation
39,35 April 17 Ivanpah Playa, CA, USA 35.54° N 115.38° W DC8 VSWIR validation
93, 84 May 14 Uardry, NSW, Australia 34° 23.50' S 145° 18.28' E DC8 TIR validation
103,76 June 5 Amburla, NT, Australia 23° 22.81'S 133° 06.79' E DC8 TIR validation
110, 73 June 6* Thangoo, WA, Australia 18.16° S 122.40° E DC8 TIR validation
63, multiple July 14 Multiple, Hawaii, USA     DC8 TIR validation
43, 33 July 18 L. Tahoe, CA, USA 39° N 120° W DC8 TIR validation
39,35 July 22 Ivanpah Playa, CA, USA 35.54° N 115.38° W DC8 VSWIR validation
             

All airborne data will be acquired with MASTER flown on either the DOE Beachcraft B200 or DC8.
* Aircraft overpass is a fallback if Amburla cannot be acquired on June 5th.