California Solar Farms
Click on Image to Enlarge

(JPG)
California Solar Farms (194,439 bytes) ( 1,618 x 694 ) |
On February 15, 2015 the Desert Sunlight solar project in California’s Mojave Desert became operational. The 550-megawatt plant generates enough electricity to power 160,000 average homes. Covering an area of 16 km2, the 8.8 million cadmium telluride photovoltaic modules take advantage of the more than 300 days of sunshine. Desert Sunlight joins the similar-sized Topaz Solar Farm in San Luis Obispo County, CA, that became operational in June, 2014. The Desert Sunlight image (left) was acquired March 12, 2015 and is located at 33.8 degrees north, 115.4 degrees west; the Topaz image (right) was acquired September 11, 2014 and is located at 35.4 degrees north, 120.1 degrees west. Each image covers an area of 10.5 x 12 km.
|
Click on thumbnails below for full resolution images.
|
California Solar Farms
Type: (JPG)
Size: (194,439 bytes)
Resolution ( 1,618 x 694 ) |
Please give credit for these images to:
NASA/METI/AIST/Japan Space Systems,
and U.S./Japan ASTER Science Team
|